We are experiencing an issue with the Manufacturing Pick Split by Operations plugin. The problem is that a full “Pick Components” operation is being generated in addition to the picks split by operations.
The BOM contains four operations, and all components are assigned to one of these operations. However, after confirming the manufacturing order, besides the transfers resulting from the individual operations, one complete Pick Components transfer is still being generated—exactly as it was before the plugin was installed. In addition, the source and destination locations are mismatched - we would expect them to take components from stock and put into Pre-Production, just as it's configured in Pick Components operation type.